Sign in Start free trial
Sales

Bid & Tender Management

Respond to tenders and bills of quantities with controlled price and compliance.

Bid and tender helps teams answer large requests for tender and bills of quantities. It structures requirements, matches lines to your catalogue, builds cost and terms, scores compliance and produces a sealed submission. It is a sub-module of CPQ, so a won bid flows straight into contract, order and commission.

46 features available 7 capability areas
Highlights

What stands out

Bill of quantities matching

Tens of thousands of lines grouped into a few hundred decisions.

Evaluation simulator

See how the buyer's formula would rank you before you submit.

Sealed envelope submission

Prices appear only in the financial envelope with fingerprinted files.

Partial award

Orders and incentives follow exactly the lots won.

Capabilities

Every feature, in one list

Search or filter. Planned items are labelled; everything else is available now.

Tender intake and requirements

Turn the buyer's request into structured work.

7 features
  • RFQ intakeRead a customer's request into proposed requirement items and bill lines that you review.
  • RFQ leads from CRMRequests arrive as leads with product lines and team scoring.
  • Bill of quantities importTurn a contractor's bill of tens of thousands of lines into a structured quote with their numbering and checked subtotals.
  • Large spreadsheet importsUpload once and read row by row in the background.
  • Statement of work and request itemsScope, acceptance criteria, assumptions, exclusions and dependencies per deliverable, with an answer for every customer request item.
  • Specification vocabularyDefine what a specification can ask for and an item can claim, with units, tolerances and standards.
  • Release to deal deskOne step hands over a quote and shows rows needing decisions.

Matching the bill to your catalogue

Match thousands of lines quickly with people deciding the doubtful ones.

5 features
  • Bill matchingIdentical lines are grouped into one decision and sure matches taken automatically.
  • Item matching with confidenceDescription or customer part number lines get catalogue suggestions with a confidence.
  • Matching vocabularyTeach the matcher abbreviations, other languages, sizes and ratings.
  • AI help with bill matchingRanks candidates already found and reads sizes or grades the vocabulary missed.
  • Specification complianceEach requirement shows whether the offered item complies, deviates or is unconfirmed.

Pricing and commercial terms of a bid

Price a tender the way the buyer will read it.

11 features
  • Cost build up and target downBuild prices from cost factors or goal-seek to a target margin.
  • Bid profit and lossCompare cost, our sale and partner share by product level, vendor, supplier, element or charge type.
  • Partner revenue shareRecord the share a parent or partner gets by family and charge type.
  • Commercial terms: indexation, progress billing, financePrice adjustment clauses, progress billing and financing terms at quote level.
  • Payment milestones, bonds and penalties
  • Cash flow and financingMonth by month customer receipts against vendor payments and financing cost.
  • Fitting the customer's budgetQuote against CAPEX and OPEX budgets by year and fit it.
  • Index series and escalationEscalate by published index with weights, lag and caps.
  • Supplier quotesApply supplier offers to resold lines.
  • Risk register and contingencyRisks with probability and impact add up to the contingency in the cost build.
  • Bond releases

Compliance and evaluation

Know how the buyer will score you.

6 features
  • Compliance score programmesScore under local-content, in-country-value or domestic-preference programmes and see what stops passing.
  • Tender evaluation simulatorRank your bid against expected competitors under the tender's formula.
  • Regulatory eligibility overlaysCountry rules on what may be sold where, with sources, run on every quote.
  • Regulatory findings on quotesSee which lines a country rule warns about or blocks, and whether counsel verified the rule.
  • Approval evidenceFrozen PDF of what approvers saw including bid P&L and tender readiness.
  • Section rightsDecide which team role edits and signs off each part of the bid.

Tender response and submission

Lots, checklists and a sealed submission.

7 features
  • Tender responseLots, bid document checklist and a sealed submission with one fingerprinted file per envelope, prices only in the financial one.
  • Document packagesQuote, price schedule, SOW and other required documents issued together.
  • Tender exportsA ZIP per envelope laid out for a buyer's portal with a manifest and checksums.
  • Tender clarificationsLog of every question and answer with lots, who asked and answered, and dates.
  • Tender noticesAlerts for deadlines, clarification answers, lot results and awards.
  • Document templatesYour own Word, Excel and PDF templates.
  • E-signatureSign packages electronically.

After the award

Accept exactly what was awarded.

6 features
  • Partial awardAccept only the awarded lots; order, deal amount and incentive credits follow.
  • Variation ordersPriced changes to an accepted contract with approval.
  • Call-offs under framework agreementsQuotes priced from the agreement's rates.
  • ContractsTerm, clauses, amendments and obligations.
  • Tender reportWin rate by lot and region, why lots are lost and value by stage.
  • Delivery schedule and freightSplit lines into deliveries.

Collaboration and AI help

Many specialists on one bid.

4 features
  • Quote assignments and critical pathSplit a large quote among specialists and rebalance the critical path.
  • Deal team and resource requestsRequest pre-sales or bid people with planned hours.
  • Notes and mentionsDiscussion kept with the bid.
  • AI drafts for non-price partsRisks, timing, milestone names and clarifications drafted for a person.
Assistant

What  AI prepares here

It prepares the work. A person confirms it.

  • Read a customer request into requirement items
  • Match bill lines to the catalogue and rank doubtful ones
  • Draft risks, delivery timing and milestone names
  • Explain how to fix checklist findings
  • Summarise a quote for the reviewer
  • Draft clarification answers for a person to send
Inside every hub

Workflow, reporting, integration, migration

The same four building blocks, specific to Bid & Tender Management.

Workflow

Bid sign-off is split by section and approvals tied to the version.

  • Bid price approval by the bid director
  • Low margin approval by finance
  • Compliance override with a reason
  • Release to deal desk
  • Partial award confirmation

Reporting and analytics

Tender reports track win rate, loss reasons and value by stage.

Datasets

Tenders and lotsClarificationsBid P and LAwards

Dashboards

Tender reportWin rate by lot and regionWhy lots are lost

Integration

Bid data is available through the public API and events.

/v1 cpq_bid_pnl, cpq_boq_imports, cpq_boq_match_groups, cpq_compliance_scores and related resources

Events

cpq.boq.matchedcpq.boq.materialisedcpq.quote.accepted

Connectors

Buyer tender portal exports (ZIP with manifest)E-signatureERP hand-off

Migration

Bid history can arrive through CPQ legacy packages or imports.

  • CPQ legacy package loadbuilt
Mobile

On the phone

Review and approval at phone width in the browser; native app planned.

Who uses it

Bid managerPre-sales engineerPricing analystFinance approverCommercial leadLegal reviewer

Industries

  • Construction and engineering
  • Telecom connectivity
  • Public sector local-content programmes
  • Industrial equipment
Questions

Frequently asked

Is this separate from CPQ?

It is a CPQ sub-module so bids reuse the same quotes and pricing.

Can it handle huge bills of quantities?

Yes, tens of thousands of lines are imported and matched in the background.

Can I see how I would score?

The evaluation simulator ranks your bid under the tender's formula.

Can I submit the response from the system?

It builds sealed envelope files for the buyer's portal; submission to the portal is done by you.

What happens if only some lots are won?

You accept exactly those lots and the order and credits follow.

How are compliance programmes handled?

They are configuration, so weights and classes change without a release.

See Bid & Tender Management on  AI

Talk to us